Airport Access Road

Dulles Airport | Loudoun County, Virginia

Project Details

Constructed several critical path improvements to an access ramp from the Dulles Greenway to Dulles International Airport.  WG Construction extended a triple 12’x8’ concrete box culvert; built a 430’ long pile foundation cast-in-place concrete retaining wall, and a 430’ long mechanically stabilized earth (MSE) wall.

Our Latest Projects

Hybrid Box Culvert for Northfax

Not just one, but two box culverts! Designed in-house and constructed under an active roadway, see how we can meet any need you may have!

Triple Arch Span Bridge for Fairfax

From design, to the deep foundations, to the construction, WG provided a triple arch span bridge for the county of Fairfax.

Full Structure for Six Acre Pond

See our skills in this radial retaining wall. Over 7,000 square feet of multiple concrete structures laid the basis for this six acre pond.

Embrey Dam, Fredericksburg, VA

In 2008, WG Construction built a reinforced concrete water intake structure for the US Army Corps of Engineers’ renovation of the 1910 Embrey Dam in Fredericksburg, VA.

Cabin Run Sanitary Sewage Pump Station

A new housing development needed a new sewage pump station from scratch, and we at WG were happy to provide a turn-key solution.

MILDEP Russel Road Bridge

WG Construction built a 120 LF clear span bridge across the Chopawamsic Creek as part of major roadway improvement. 

Affiliations / Registrations

Share by: